Project Brief

We were commissioned to work on a factory site in Coventry. We attended a site visit to review the proposed concept designs for containment runs. We then developed the concept designs further to enable us to put together costings.

Solution

After load calculations, our engineering design team recommended a welded option due to higher load bearing properties. After client agreement, our workshop commenced manufacturing to meet the delivery schedule. Due to rapid installation on site, the PM required the frames to be manufactured quicker than the original schedule. We were able to accommodate the revised tighter deadline schedule.

The design was also adjusted on-site to install the pipework horizontally instead of vertically due to ease of installation. This revised proposal was structurally checked and verified by our design team.

Containment Design -MIDFIX

Need help finding the right product?

Call the sales team on 0115 922 1585 for specialist advice

Talk to an expert